Most replacement windows take between one and three hours each to install — but the full project timeline depends on how many windows you’re replacing, whether you’re going with impact-rated units, and what surprises the existing frame reveals once the old window comes out.
Planning a window replacement in Fort Lauderdale means accounting for more than just installation hours. Permits, inspections, and lead times on impact glass all shape the real schedule.
This guide walks through single-window timelines, whole-house project estimates, what slows jobs down in South Florida specifically, and exactly what happens on installation day so you know what to expect.
The Short Answer: How Long One Window Takes
Single Window Installation Time
One standard replacement window — properly sized, no frame damage, no permit complications — takes an experienced crew roughly one to two hours from first cut to final seal. Impact windows run closer to two to three hours per opening because of the additional anchoring, buck framing, and sealing requirements that Florida’s hurricane protection standards demand.
That per-window number is your baseline. Everything else in this article is about what moves it.
What the Clock Actually Starts and Stops On
The installation clock starts when the crew begins removing the existing window and stops when the new unit is set, shimmed, sealed, and the opening is clean. It does not include the permit inspection visit, which happens on a separate day after the installation is complete. It also does not include the lead time between when you sign a contract and when your windows actually arrive — impact glass is custom-ordered and typically takes four to six weeks to fabricate.
Whole-House Window Replacement Timelines
Small Home (5–8 Windows)
A smaller Fort Lauderdale home with five to eight windows is typically a one-day job. A two-person crew working efficiently moves through that count in six to eight hours, assuming no structural surprises and all windows are standard sizes. Most homeowners are back to normal by late afternoon.
Average Home (10–15 Windows)
Ten to fifteen windows usually runs one to two full days. Crews often split this across two days intentionally — it gives the sealant on day-one windows time to cure before the inspection, and it keeps the work quality high rather than rushing the final units at the end of a long day.
Large Home or Full Replacement Project (16+ Windows)
Larger homes or full-replacement projects with sixteen or more openings should be planned as two to three days of installation work. Add the permit inspection day on top of that. If any openings require custom sizing or structural repair, budget an additional day per complication.
What Makes a Window Job Take Longer in South Florida
Impact Window Sizing and Custom Orders
Almost every impact window installation in South Florida involves custom-ordered units. Florida homes — especially older CBS construction in Broward County — rarely have openings that match standard catalog sizes. Custom fabrication adds four to six weeks to the pre-installation timeline, and if a unit arrives with a defect, that wait resets. This is the single biggest source of schedule frustration I hear from homeowners, and it has nothing to do with the installation crew.
Permit Pulls and Inspection Scheduling in Fort Lauderdale
Fort Lauderdale requires a permit for window replacements, and the City of Fort Lauderdale Building Services department schedules inspections separately from the installation itself. Permit approval typically takes one to two weeks. Inspection scheduling after installation adds another few days to a week depending on the inspector’s calendar. A licensed contractor handles all of this — but homeowners need to understand that the permit and inspection process adds real calendar time that does not show up in the installation-day estimate.
Rotted Frames, Stucco Repair, and Structural Surprises
Old windows in South Florida homes hide problems. Moisture intrusion, rotted wood bucks, deteriorated stucco around the opening, and corroded fasteners all add time once the existing window comes out. A frame repair that takes two hours per opening can turn a one-day job into a three-day job. A good contractor flags likely problem openings during the pre-installation walkthrough, but some surprises only reveal themselves once the old unit is removed.
Impact Windows vs. Standard Replacement Windows — Does Type Affect Time?
Why Impact-Rated Installations Add Steps (and Why That’s Worth It)
Standard replacement windows drop into an existing frame with minimal modification. Impact windows are a different installation entirely. They require a reinforced buck frame, specific anchor spacing per the product’s Notice of Acceptance (NOA), a continuous bead of approved sealant, and documentation that the installation matches the engineered drawings submitted with the permit. Each of those steps adds time. A standard window might take forty-five minutes. The same opening with an impact unit takes two to three hours.
That extra time is not inefficiency. It is the installation meeting the code requirements that make the window actually perform during a hurricane. Cutting corners on anchor spacing or sealant coverage to save an hour is how windows fail when a storm hits.
What Happens on Installation Day — Step by Step
Prep, Protection, and Old Window Removal
The crew arrives, walks the openings with you, and lays down drop cloths and protection on interior floors and furniture near each window. Old windows are scored, cut free from the frame, and removed carefully — the goal is to avoid damaging the surrounding stucco or drywall. Debris goes directly to the truck. This phase runs about twenty to thirty minutes per opening.
Setting, Shimming, and Sealing the New Window
The new window goes in level, plumb, and square — shimmed until it sits correctly in the opening. Anchor fasteners are driven at the spacing specified in the NOA. Sealant is applied in a continuous bead around the perimeter, both interior and exterior. For impact units, the crew also installs any required flashing tape or backer rod before the final sealant pass. This is the longest phase per window — typically sixty to ninety minutes for an impact unit.
Inspection, Cleanup, and Final Walkthrough
Once all windows are installed, the crew cleans the openings, removes all protection materials, and walks you through each window — demonstrating operation, locks, and any tilt-in cleaning features. They leave the job site clean. The permit inspection is scheduled separately and does not require you to be home in most cases; your contractor coordinates directly with the inspector.
How to Keep Your Project on Schedule
What You Control as the Homeowner
The biggest schedule killer on the homeowner side is delayed decision-making. Signing the contract and approving the window specifications quickly gets your order into fabrication faster. Clearing furniture and window treatments before the crew arrives saves time on installation day. And being reachable when the contractor calls about a frame issue or a delivery update keeps the project moving instead of stalling while they wait for a callback.
What a Good Contractor Controls
A reliable contractor pre-pulls the permit before your windows arrive so there is no waiting once the product is on-site. They order windows with enough lead time to absorb a fabrication delay without pushing your installation date. They staff the job correctly — not one person trying to do a fifteen-window house alone. And they communicate proactively when something changes, rather than leaving you to wonder why the truck did not show up.
Frequently Asked Questions
How long does it take to install one impact window?
One impact window typically takes two to three hours to install correctly. That includes removal of the existing unit, frame preparation, setting and anchoring the new window, and completing the sealant work to code.
Can windows be installed in one day?
Yes, for most homes with ten or fewer windows. A two-person crew handles five to eight windows comfortably in a single day. Larger homes or those with frame repairs needed may require two days.
How long does the permit process take for windows in Fort Lauderdale?
Permit approval in Fort Lauderdale typically takes one to two weeks. After installation, the inspection is scheduled separately and usually happens within a few days to a week of the request.
Does weather affect window installation time?
Heavy rain stops exterior sealant work because wet surfaces prevent proper adhesion. A good crew monitors the forecast and schedules accordingly. South Florida’s afternoon storm pattern in summer means most crews start early and plan to have exterior sealing done before midday.
How far in advance should I schedule my window installation?
Plan for six to eight weeks from contract signing to installation day. That accounts for four to six weeks of fabrication time on custom impact units plus permit processing. Scheduling during the slower winter months can sometimes shorten that window.
Conclusion
Replacement window timelines in Fort Lauderdale run from a single afternoon for one window to three days for a full-house impact upgrade — with permit and fabrication time adding weeks to the calendar before a crew ever arrives. The installation itself is the fast part.
Understanding what drives the schedule — custom glass lead times, permit pulls, frame conditions — lets you plan realistically and avoid the frustration of a project that feels like it is running late when it is actually running exactly on time.